Sewer Use Credit Application

If you are a commercial customer in Johnson County and are connected to the county sewer lines, you will receive an invoice for sewer use on a monthly basis. Many businesses use water that does not enter the sanitary sewer system through water in products they produce, evaporation from cooling towers (and/or) irrigation systems.

Businesses requesting a sewer use credit must meter such water through a deduct meter, installed by a licensed plumber. Once the meter is set, you or your plumber must provide JCW with proof of a meter set.

Should you decide to participate in the program, it will be the responsibility of the owner/manager of the property to install a deduct meter, read the deduct meter between the 18th and no later than the 23rd of the each month and provide such meters reads on a JCW supplied log to JCW via email at [email protected] along with a photograph of the read each month. You may obtain the meter read spreadsheet on JCW’s webpage as listed below or we will forward the spreadsheet upon approval of the application.

If you are interested in participating in this program, it is important that you read JCW’s complete deduct policy and procedures, the entire information provided for sewer use credits . If you have further questions or concerns, please visit our webpage at www.jcw.org or contact Twila Smith at 913-715-8514 or email [email protected].

Indicates required field
Service Address
Irrigation System Only
(Irrigation meter installed & maintained by the water purveyor /account will not qualify for JCW deduct program)
Irragation/Deduct Meter
(Owner installation and maintained)
Check all that apply
Green Space (irragation)
Cooling Tower
Water in Product
Pool
Fountain(s)
Recaptured grey/gray Water
If you selected 'Yes' on the previous question, please provide the following information
Is your business/organization requesting to participate in the JCW deduct program?
Requesting to participate in the JCW deduct program
Property owners will be responsible for setting, reading and all maintenance of such meters. Water Purveyors located in Johnson County do not set, read or maintain deduct meters. The following information is required for consideration for Johnson County Wastewaters Sewer Use Credit.
  • A drawing or schematic of the building plumbing with proposed and/or existing meter location(s) and water discharge points clearly labeled. The deduct meter installation must include a backflow preventer and shut off. The schematic does not need to include all interior building plumbing but it does need to clearly denote the location of irrigation systems, cooling towers and/or anything that will be metered for a Sewer Use Credit.
  • Include make, model, and size of proposed or existing meter with the Sewer Use Credit Application Form. All new meters installed must comply with local water provider and American Water Works Association (AWWA) standards. The meter must also be appropriately sized for the applicants system. Registers on the meter must be straight-reading type and read and totalized in U.S. gallons.
  • Name of contractor performing installation of meter. It is the customer’s responsibility to insure that all work performed as a part of this program meets local building and plumbing codes and any requirements of the water purveyor. The installation contractor should check with the local building authority on the requirement of a building permit.
This form must be received within thirty (30) days after receipt of bill. Applications are processed on a case by case basis and you may be required to furnish additional information. JCW requires that customers pay their outstanding wastewater bills during the application process. If you have any further questions please call 913-715-8514.