Status of Roads Closed  for Bridge, Culvert, and Road Construction as of June 15, 2009

 

199th Street from Sunflower Rd. to Four Corners Rd.

The contractor is working on the new bridge substructure.

The road was closed December 2, 2008.  The road should be re-opened in about 2-3 months.

 

Kenneth Road from 159th Street to 162nd Terrace.

The Contractor is working on watering of new sod.  The road is open to traffic.

The road was closed March 16, 2009.

 

Moonlight Road from 139th Street to 143rd Street.

The County is working on grading the road between 139th Street to 141st Street.

The road was closed March 25,2009.  The road should be re-opened in about 2 months.

 

Gardner Road 0.3 mi. North of 127th St.(12428 Gardner Rd.) (Bridge H.00-11.34)

The County is working on extending the existing structure.  The road will be closed during daytime working hours only.

The road was closed March 25, 2009.  The road should be re-opened in about 1 month.

 

207th Street from Metcalf Ave. to Nall Ave.

The Contractor is working on grading.

The road was closed on May 14, 2009.  The road should be re-opened in about 2-3 months.

 

191st Street 0.5 mi. West of Edgerton Rd. (38268 W. 191st St) Bridge (B.52-3.00)

The Contractor is working on new structure.

The road was closed May 18, 2009.  The road should be re-opened in about 4-6 weeks.

 