2005 PROJECTS CARS     PROJECT      NUMBER       SCOPE OF PROJECT "CITY"     Admin.City     Submitting City PROJECT COST TOTALS CONTRACTOR
           
87th Street:    Quivira to Goddard & I-35/Alt 69 Interchange 320000564 Route Enhancement/System Mgt Lenexa  Overland Park $950,000  
127th Street Overpass over I-35 320000565 Const. 6 lane overpass over 127th St. & Const. and widen 127th St. from Mur-Len Rd. to Kansas City Road Olathe  $2,448,000  
135th Street widening & US-69 Northbound Ramp 320000566 Const. N. Bound ramp fr. 135th St., & widen to 6 lane arterial fr. Metcalf Ave. to Antioch Rd. Overland Park $1,054,000  
Mission Road: Shawnee Mission Pkwy. To 53rd St. 320000567 Remove & replace pavm't along w/ repairs to curbs & inlets   Fairway $67,000 McAnany Construction, Inc.
Roe Avenue: Tomahawk Creek Pkwy. To 135th Street 320000568 Const. 42'-3 lane road w/10' bike trail, storm drainage & street lights Leawood $794,000  
College Boulevard: Roe Avenue to State Line Road 320000569 2" M & O w/curb and ramp replacement Leawood $161,000  
Roe Avenue: 119th Street to College Blvd. 320000570 4" M & O w/minor base repair & sdwk ramps Leawood $191,000  
Lamar Avenue:  Martway to Shawnee Mission Pkwy. 320000571 Partial base repair, resurfacing, striping, curbs, & ramps Mission   $165,000 McAnany Construction, Inc.
63rd Street:  State Line to Mission Rd. 320000572 Remove & replace asph. pavm't w/repairs on curbs & inlets   Mission Hills     Fairway $335,000  
151st Street: Pflumm Rd. to Quivira Rd. 320000573 Widen to 4 Lane Divided Arterial  Olathe    Overland Park $2,445,000  
Quivira Road Interconnect:  119th St. to 127th St. 320000574 Install 3"Conduit & 72 Count Fiber Optic Cable Interconnect  & Patch Panels Overland Park $51,000  
95th Street: Barkley Ave. to Nall Ave. 320000575 1 1/2" M & O w/curb replacement Overland Park $285,000 O'Donnell & Sons Construction                        
Quivira Road: 119th St. to 127th St. 320000576 1 1/2" M & O w/curb replacement Overland Park $187,000 O'Donnell & Sons Construction                        
Quivira Road: 127th St. to 135th St. 320000577 1 1/2" M & O w/curb replacement Overland Park $197,000 O'Donnell & Sons Construction                        
Antioch Road: 75th St. to 85th St. 320000578 Install Street Lighting Overland Park $86,000  
151st Street: 500' W. of Antioch Rd. to Travis Ave. 320000579 1 1/2" M & O w/curb replacement Overland Park $357,000 O'Donnell & Sons Construction                        
Nall Avenue: 135th St. to 143rd St. 320000580 Reconstruct road to 4 lanes, w/curb, strm sewer, st. lights & sdwk Overland Park     Leawood $2,129,000 APAC-Kansas, Inc.                       Kansas City Division                                          
Mission Road: 71st St. to 75th St. 320000581 2" M & O w/curb & sdwk replacement, pvmt markings, 6' wide pavers @ x-walks, loop detectors and full depth conc. @ approaches Prairie Village $235,000 McAnany Construction, Inc.
Mission Road: Somerset Dr. to 83rd St. 320000582 2" M & O w/curb & sdwk replacement, pvmt markings, loops and full depth conc. @ approaches Prairie Village $171,000 McAnany Construction, Inc.
Roe Avenue:  57th St. to County Line 320000583 2" M & O w/curb & sdwk replacement, ramps, reset loops,spot full depth conc. patching, mh adj. & new sdwk Roeland Park $917,000  
51st Street:  Rosehill Rd. to Quivira Dr. 320000584 Improve to  major collector  w/street lights,storm drainage, curbs, st. lights, bike trail, paving, markings & signing Shawnee $1,815,000  
75th Street Rehablitation:  Switzer Rd. to Quivira Rd. 320000585 M & O, replacing bad curb & sdwk, pavm't markings, signs & st.lights Shawnee $234,000  
State Line Road: County Line to Shawnee Mission Pkwy. 320000586 2" M & O w/curb & sdwk replacement, handicap ramps, pavm't markings and mh & water valve adjustments. Westwood        Mission Woods       Westwood hills $126,000